The Bioretention Basins perform a crucial role of cleansing all water run off from roads, carparks etc of contaminants before they reach the main stormwater system by filtering through 3 specific drainage layers consisting of a Bioretention Filter Media, coarse sand transition layer and gravel drainage layer. The clean water is then picked up by sub soil drainage lines and directed into the stormwater system.
Bioretention Basins are sometimes turfed such as the Oakdale Industrial Estate or planted with provenance wetland plants such as the Bunnings Facility at Eastern Creek.
Undercover Landscapes’ Maintenance Division then takes over to keep the basins in pristine condition, not only enhancing their performance,but creating an attractive landscape as well.
Undercover Landscapes installed both off these projects for Burton Civil Engineering Contractors.